As students turned in assignments and took final exams remodeling on Communications Technologies rooms 224S, 224M and 224N began. These rooms are often used for the delivery of Technology Education courses and TECA (Technology Education Collegiate Association) meetings. Most Technology Education students are familiar with these classrooms. Follow along with the pictures and see the progress!

 

 

May 19, 2008 — Remodeling begins. Two walls between 224S, 224M, and 224N are removed and replaced with new walls using studs running from floor to ceiling. Carpet is scraped off the floor in 224M. Ceiling tile is removed to expose wiring and ventilation that will be replaced. Note the plans on the podium. Estimated completion date is July 18, 2008.

01
View of 224S and 224M in mid-May

 

02 03
East mid-May East hallway in late May/early June

 

04 05
East hallway late June Hallway on July 6, 2008


A hall was added to the east side of Communication Technologies 224S and 224M. In mid-May the wall was metal studs. Sheetrock was added and taped in late May and early June. Note the closets on the east side of the hallway that will be used to store materials for student organizations such as TECA (Technology Education Collegiate Association). The hallway is painted by July 6. The finishing touches - lights, ceiling panels and carpet will add the finishing touches.

 

224M gets a facelift. By mid June the new walls were completed in 224M, sheetrock was hung and the taping of wall joints started. Two columns and an overhang on the west end of the room have been removed. By July 6, 2008 the walls are painted and new wiring for lighting is in place. Ceiling tile and carpet are all that is left!

06 07
Looking west in room 224M in mid-June West view of 224M on July 6
08 09
Looking east in room 224M in mid-June. East view of 224M on July 6


The south end of 224 in the Communications Technology Building underwent renovation on north and east walls. These photos show the south and west walls largely untouched with newly taped sheetrock on the north side.

10 11
View of the west end of 224S in mid-June. West view of 224S on July 6.

 

The south end of 224 in the Communications Technology Building underwent renovation on north and east walls. These photos show the east walls with taped sheetrock and a fresh coat of paint by July 6.

12 13
View of east end of 224S in mid-June. East view of 224S on July 6, 2008.