University of Wisconsin Stout | Wisconsin's Polytechnic University
Professional Education Programs and Services
Enrich your life through programs relevant to the changing needs of business, industry, educators and society.
Enrich your life through programs relevant to the changing needs of business, industry, educators and society.
1.1 Introduction of participants and facility
1.2 Background of Six Sigma
1.3 The Six Sigma strategy
1.4 The Six Sigma metric
1.5 Deployment of Six Sigma projects
2.1 Motivation, influence and leadership styles
2.2 Support and accountability
2.3 Managing conflict
2.4 Empowerment and negotiation
2.5 Coaching
4.1 Cost of quality
4.2 Documenting and integrating bottom line results
4.3 Benchmarking
4.4 Voice of the customer
4.5 Project management
4.6 Project definition
4.7 Quality function deployment (QFD)
5.1 Software introduction and lab.
5.2 Overview of measure phase
5.3 Six Sigma metrics
5.4 Six Sigma project selection
5.5. Measurement tools
5.5.1 Basic tools
5.5.1.1 Flowcharting
5.5.1.2 Data collection and check sheets
5.5.1.3 Pareto analysis
5.5.1.4 Problem analysis worksheet
5.5.1.5 Trouble shooting techniques
5.5.1.6 Cause and effect diagrams
5.5.1.7 Force field analysis
5.5.1.8 Affinity diagram
5.5.1.9 Nominal group technique
5.5.1.10 Creative thinking
5.6 Basic statistics
5.6.1 Data entry and manipulation on spreadsheets
5.6.2 How to use descriptive statistics
5.6.3 The nature of variation
5.6.4 Measures of central tendency and dispersion
5.6.5 Concepts of probability
5.6.6 Types and use of sampling and randomization
5.6.7 Histograms and other charting techniques
5.6.8 The normal distribution and other statistical distributions
5.6.9 The use of confidence intervals
5.6.10 Process capability
5.7 Project review
5.7.1 Develop metric
5.7.2 Select project
5.7.3 Collect data (apply proper tools)
5.8 Variables control charts
5.9 Process capability, review
5.10 Safety margin
5.11 MSA; Gauge R&R
5.12 Statistical tolerancing
5.13 Attributes control charts
5.14 FMEA; process
5.15 Project review
5.15.1 Collect data (apply proper tools)
6.0 Analyze phase
6.1 Overview of analyze phase
6.2 Analysis techniques
6.2.1 Exponential smoothing
6.2.2 Scatter diagrams and regression analysis
6.2.3 Test planning and design
6.2.4 Hypothesis testing
6.2.5 ANOVA
6.3 Project review
7.0 Improve phase
7.1 Overview of improve phase
7.2 Improvement tools
7.2.1 Overview of DOE
7.2.2 Basic DOE techniques
7.2.3 Advanced DOE techniques
7.2.3.1 Full factorial
7.2.3.2 Fractional factorial
7.2.4 Robust DOE - Taguchi methods
7.3 Project review
7.3.1 Plan DOE
8.0 Control phase
8.1 Overview of control phase
8.2. Control tools
8.2.1 SPC; Variables and attributes review
8.2.2 Zone control charts and narrow limit gaging
8.3 Control planning
8.3.1 Control plan
8.3.2 Gage pontrol
8.3.3 Mistake proofing
8.3.4 Preventative maintenance
8.3.5 Connections to ISO 9000
8.4 Case study
8.5 Project review and wrap-up
8.5.1 Control plan
8.5.2 Tie it all together D, M, A, I, C
9.0 Report results
9.1 Final project report